News

Crack Seal Project - Walker Road and Jaycox Road

Specialized Constuction will be conducting crack seal operations on Walker Road and Jaycox Roads from August 17 through September 1, 2025, weather permitting.

Crack sealing will take place at the following locations: 

Walker Road 

  • From pavement transition at Ambleside to 100' west of Avon Belden (SR 83). 
  • From Avon Belden (SR 83) to pavement transition west of Avon Point. 

Please note: there will not be crack sealing at the intersection of Walker Road and Avon Belden Road (SR 83). 

Jaycox Road 

  • From 25' north of railroad tracks to pavement transition south of Walker Rd. 
  • From pavement transition north of Walker Road to Electric Boulevard (not including east/west travel lanes through intersection). 
  • From Electric Blvd (not including east/west travel lanes) to pavement transition south of Lake Road (US 6).

During crack sealing, flaggers will direct traffic through the work zone.